Sunday, January 31, 2010

Basic about it

Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010.[1][9] The building is part of the 2 km2(490-acre) flagship development called Downtown Burj Khalifa at the "First Interchange" along Sheikh Zayed Road, near Dubai's main business district.

The tower's architecture and engineering were performed bySkidmore, Owings, and Merrill of Chicago. Adrian Smith, who worked with Skidmore, Owings and Merrill until 2006, was the chief architect, and Bill Baker was the chief structural engineer for the project.[10][11] The primary contractor was Samsung C&T of South Korea, who also built the Taipei 101 and Petronas Twin Towers.[12] Major subcontractors included Belgian group Besix and Arabtecfrom the UAE. Turner Construction Company was chosen as the construction project manager.[13] Under UAE law, the Contractor and the Engineer of Record are jointly and severally liable for the performance of Burj Khalifa. Therefore, by adoption of SOM's design and by being appointed as Architect and Engineer of Record, Hyder Consulting is legally the Design Consultant for the tower.

The total cost for the Burj Khalifa project was aboutUS$1.5 billion; and for the entire new "Downtown Dubai", US$20 billion.[14] Mohamed Ali Alabbar, the Chairman ofEmaar Properties, speaking at the Council on Tall Buildings and Urban Habitat 8th World Congress, said in March 2009 that the price of office space at Burj Khalifa had reached US$4,000 per sq ft (over US$43,000 per m2) and that theArmani Residences, also in Burj Khalifa, were selling for US$3,500 per sq ft (over US$37,500 per m2).[15] The completion of the tower coincided with a worldwide economic slump and overbuilding, causing it to be described as "the latest ... in [a] string of monuments to architectural vacancy."[16]

No comments:

Post a Comment